Foundation & Structure

R.C.C Framed Structure to withstand seismic loads and wind.

Light weight brick masonry in cement mortar.

Plastering

Internal

12mm thick coat cement plaster smooth finishing.

External

18mm thick double coat sand faced cement plastering.

Doors

Toilets

Laminated doors with standard hard ware.

Fire

Doors Fire rated steel doors (as per norms).

Service Shaft Door

Pressed metal framed/flush doors shall be of 1.2mm galvanized. sheet of 1 hour fire rated for service areas/ ducts/ shafts.

Shutters For Retail (G+1)

Motorized perforated (small holes) shutter for all unit of repute make with 12mm toughened spider glazing Glass walls and designer hardware of reputed make.

Internal Doors For Commercial

Indian BT or African Teak wood frame with designer flush shutter with two sides Veneer with melamine polishing and reputed hardware fittings powder coated aluminum shutters

Windows

Window system with single glazing with specially designed extruded. Aluminum sections with powder coating and system designed, water tightness and heat proof. (or) UPVC Windows.

External Painting

Texture paint containing synthetic plaster chemicals, having very mild keys finish in three coats, synthetic plaster by trowel plus two coats of chemical over coat by brush in approval color

Glazing

Glazing as per glazing design.

Service Areas

Two coats of Acrylic OBD over one coat of primer.

Flooring

Main Entrance Lobby

Granite Slabs

Upper Floors Entrance Lobby

Granite Slabs.

Toilets

Separate urinal blocks and toilet blocks for men and women are provided with first quality sanitary and CP fittings non skid tile flooring and cladding partition walls and counters in granite and toilet blocks.

Staircase Flooring

Granite stones for main staircases and Kota stones for fire staircases

Parking Area

Vdf Flooring

Drive Way

Vdf Flooring

Lift Walls

Granite Slabs

Plumbing And Sanitary Services

Plumbing Fixtures

Kohler/Hindware sanitary ware white in colour with Branded CP fittings.

Pumps

As Per Design

Electrical Facilities

1.Electrical power for all units as per the load details with separate distribution boards
2.Lighting for common areas such as corridors, parking, lobbies areas as per standards
3.Sub station with required transformer capacity and sandwich bus duct to each unit
4.100% DG backup shall be provided.
5.Earthing grid for power system with earth resistance as per standards and special earthing grid for computers, earth strips from special earthing extended to each unit.
6.Lightning protection for the building as per standards

Air-Conditioning Facilities

All the shops & Offices are provided with single point Air Conditioning supply, from where the shop & Office owners can have A.H.V's and A.C ducting as per the requirements.

Communication System Facility

1. Floor ducts in every unit to lay communication network cables. Shafts exclusively for communication cables
2. Building Management System (BMS) for all the services.
3. Sprinkler system in all common areas & the sprinkler system will be terminated into office space
4. Addressable Fire Alarm System with Detectors as per NBC National Building Code).
5. Recommendations of Fire hazard and activation whenever fire detectors operated.

Lifts

Passenger Lifts

10 No.s passenger lifts of Johnson or equivalent make. As per architect design

Retail Floor Lifts

2 No.s passenger lifts of Johnson or equivalent make. As per architect design

Goods & Fire Lifts

6 No. Goods lift of Johnson or equivalent make. As per architect design

LANDSCAPING

Landscaping shall be provided as per design